Let's Build It
On Screen First

Construction Intelligence. Delivered.|

3D → 7D Construction Intelligence

One continuous workflow — from clash-free 3D models through 4D scheduling, 5D cost, 6D sustainability, all the way to a live 7D digital twin.

3D Visualization, 4D Schedule, 5D Cost, 6D Sustainability, 7D Operations — full BIM workflow illustration

See the Workflow In Motion

A short walk through the full 3D to 7D delivery chain — end to end.

MG BIM Partners — 3D to 7D construction intelligence

MG BIM Partners — 3D → 7D

A Global BIM
Consulting Firm

MG BIM Partners Inc. is a Canadian-incorporated BIM consulting firm operating through a curated network of independent expert partners. We cover every construction intelligence dimension — from 3D coordination to 7D digital twin handover — across three regions: MENA, Europe, and North America.

We build on the IFC 4.x open standard, which means no vendor lock-in, full interoperability, and seamless integration into your existing CDE.

Meet Our Partners →
3
Expert Partner Firms
3
Regions Covered
7
BIM Dimensions
IFC
4.x Open Standard
ACCA
Technology Partner

Full-Spectrum BIM
Services

3D
Model Coordination

Multi-discipline clash detection and federated model management using IFC 4.x. Zero surprises on site.

4D
Schedule Simulation

4D construction sequencing linked directly to your programme. Visualise the build before the first shovel hits ground.

5D
Cost Intelligence

Real-time QTO and cost tracking extracted from the model — not from a spreadsheet.

6D
Sustainability & ESG

Energy performance, carbon tracking, and LEED/BREEAM alignment embedded from design to delivery.

7D
Digital Twin

Operational-phase BIM handover. Your asset lives on as a data-rich digital twin from day one.

BIM
MGT
BIM Management

BEP authoring, EIR review, CDE setup, and project-wide BIM governance from pre-contract through handover.

SCAN
TO BIM
Reality Capture

Laser scanning, photogrammetry, and as-built IFC modelling. We turn existing buildings into accurate BIM — typically at ±5 mm survey accuracy.

Full Service Detail →

Our Partner Firms

Technology Partner

Your Next Project Deserves
7-Dimension Intelligence

Tell us about your project. We'll scope the right BIM engagement — from quick coordination to full digital twin delivery.

Start a Conversation