Home / What We Deliver

Seven Dimensions.
One Network.

We cover the full BIM spectrum — from initial 3D coordination to operational digital twin handover — using an open IFC 4.x standard that integrates with any CDE. Each dimension is delivered by a specialist partner within our curated network.

3D → 7D BIM
Services

3D

Model Coordination & Visualization

Multi-discipline BIM coordination using IFC 4.x federated models. We detect and resolve clashes between architecture, structure, and MEP before construction begins — reducing rework risk by up to 40%. Deliverables include a coordinated federated model, BCF-based clash reports, and model health validation against your EIR.

Clash Detection Federated Models IFC 4.x BCF Reporting EIR Compliance
3D 3D BIM clash detection model — federated multi-discipline coordination
4D

Construction Schedule Simulation

Time-linked BIM models that animate the full construction programme — typically cutting 15–25% off schedule slippage by exposing sequence conflicts before mobilization. We identify resource bottlenecks and critical-path deviations weeks before they hit site. Delivered as a linked IFC model, a synchronized P6/MS Project file, and a phase-simulation video for stakeholder review.

4D Simulation Primavera P6 Programme Linking Sequence Review
4D 4D BIM construction schedule simulation linked to project programme
5D

Cost Intelligence & QTO

Quantity take-off and cost tracking extracted directly from the BIM model — typically 60–80% faster than manual QTO, with single-digit deviation against tender BOQs. We deliver real-time cost variance analysis, procurement-ready BOQs, and change-order impact assessed against the live federated model.

QTO Cost Control BOQ Generation Change Order Impact Budget Tracking
5D 5D BIM cost intelligence and quantity take-off from federated model
6D

Sustainability & ESG Performance

ESG performance embedded in the BIM process — not bolted on at the end. We deliver energy simulation, embodied-carbon tracking, daylighting analysis, and LEED / BREEAM / CEEQUAL alignment from concept through commissioning — targeting 20–35% operational-energy reduction versus baseline. Computational design support is available for optimised low-carbon building envelopes.

Energy Simulation LEED / BREEAM Carbon Tracking Daylighting Analysis Computational Design
6D 6D BIM sustainability and ESG performance — energy and carbon tracking
7D

Digital Twin & Asset Operations

The 7D model is your facility-management asset — structured for operations from day one. Owners running BIM-handed-over assets see 10–25% lower lifecycle operating cost versus document-based handover. We deliver IFC-based FM handover packages, IoT-ready digital twin integrations, and maintenance intelligence sized to the asset. Available as a static IFC asset or as a live connected digital twin with sensor data ingestion.

Digital Twin FM Handover IoT Integration Asset Lifecycle COBie / IFC
7D 7D BIM digital twin with IoT integration and asset operations data

Scan-to-BIM

Laser scanning, photogrammetry, and as-built modelling for existing buildings, infrastructure, and heritage assets — surveyed to ±5 mm point accuracy. We deliver registered point clouds, LOD-graded IFC 4.x as-built models, and conflict-with-existing-conditions reports that cut renovation risk before design begins. Essential for retrofit, refurbishment, due-diligence, and brownfield projects where the existing fabric must drive the design.

Terrestrial Laser Scanning UAV / Drone Photogrammetry Point Cloud Registration As-Built IFC Modelling LOD 200–400 Grading Heritage & Retrofit Clash with Existing
Scan-to-BIM workflow — drone LiDAR, terrestrial laser scanning, point cloud to IFC model

BIM Management

Every successful BIM project needs governance before it needs geometry. MGBIM provides end-to-end BIM management — from pre-contract EIR review and BEP authoring through CDE configuration, model quality control, and owner-side BIM supervision. We operate as your Owner's BIM Representative when you need independent oversight of your design-build team.

  • → Employer's Information Requirements (EIR) authoring & review
  • → BIM Execution Plan (BEP) pre-contract & post-contract
  • → Common Data Environment (CDE) setup & workflow configuration
  • → Model validation against EIR and ISO 19650 compliance
  • → Owner's BIM Representative — independent project-wide oversight
BIM Management — EIR, BEP, CDE governance across project lifecycle

Open BIM. No Lock-In.

We exchange on IFC 4.x. Your data stays yours — compatible with Revit, ArchiCAD, Tekla, OpenBIM tools, and any ISO 19650-compliant CDE. No proprietary formats. No hidden integration costs.

IFC 4.x ISO 19650 BCF 2.1 COBie CDE-agnostic

Scope Your BIM Engagement

Tell us your project — we'll match the right partner network partners and right dimensions for your phase.

Start a Conversation